Daily and weekly rates
Quoted in writing with the mobilisation cost separated out.
The plant we run on our own sites is available to other contractors when it is idle. Operator, fuel and mobilisation quoted up front so the rate you are given is the rate you pay.
Anybody can promise professional and reliable. These are the four things you can hold us to on this job, and the four things worth asking any other company to name before you pay them.
Quoted in writing with the mobilisation cost separated out.
Our operator, or yours if they are certified.
We handle low-bed transport to your location.
Serviced machines. Downtime on our fault does not run down your hire clock.
Tell us the scope and the location. What comes back is a written figure, not a range you have to negotiate against later.
Scope first, price second, work third. If a stage cannot be done properly we say so before it starts, not after it has been paid for.
What you are moving, how much of it and where.
The cheapest hire is the right-sized machine, not the smallest one.
Availability confirmed in writing before you plan your programme around it.
Machine on site, hours logged, invoice against logged hours.
Rates are quoted per machine with mobilisation separated out, because a hire rate that hides the low-bed is not a rate, it is an opening position.
One machine does the digging, the trenching and the loading. On most house plots it is the only heavy plant the job ever needs.
Earthmoving
Foundation excavation, trenching for services, site clearance and loading.
Ground that was never compacted moves later. This is the machine that decides whether your access road survives the first rains.
Compaction
Compacting access roads, hardcore fill and oversite before you cast.
Three sizes, because a genset too big burns diesel you are not using and one too small stalls the mixer halfway through a pour.
Power
Powering a full site where there is no grid connection yet.
Power
Running mixers, vibrators and power tools on an unconnected plot.
Power
Events, standby power and small sites.
Height without a scaffold, quicker to set up, moved by one person, and it goes up and over what is already built.
Access
Working at height on facades, roofing and external finishing.
Access
Ceiling work, external lighting and signage installation.
Access
Tight sites and indoor access where a scaffold will not fit.
Demarcated plots with documentation prepared before you pay the balance.
Access road and electricity already run to the boundary.
Site plans, boundary re-establishment and cadastral work by our own team.
From foundation to finish, on your plot or on ours.
Blocks, cement and iron rods, wholesale and retail, delivered.
Tell us the location and the scope and we will price it in writing, usually the same day. If we are not the right people for the job, we will tell you that instead of quoting for it.